Easley Planning & Development Department

Click for Easley, South Carolina Forecast

Frequently Asked Questions

Up Next

What is my property zoned?

You can find the zoning of your property on the City of Easley Zoning Map.

PDF

6.3MB

Download the City of Easley Zoning Map (Note, this is a large file)

What uses are allowed in my zoning district? What are the setbacks for my property?

You can access zoning district uses, setbacks and other information below. You need to browse to the specific section of the ordinance:

  • Section 2.6.01-2.6.02: Single Family Residential R-10 Zoning Setbacks R-7.5 Zoning Setbacks
  • Section 2.6.03-2.6.04: General Residential GR-1 Zoning Setbacks GR-2 Zoning Setbacks
  • Section 2.6.05: Neighborhood Commercial NCD Zoning Setbacks
  • Section 2.6.06: Office Institutional Districts OI Zoning Setbacks
  • Section 2.6.07: General Commercial GCD Zoning Setbacks
  • Section 2.6.08: Core Commercial CCD Zoning Setbacks
  • Section 2.6.09: Industrial District IND Zoning Setbacks
  • Section 2.6.10: Medical District MED Zoning Setbacks
  • Section 2.6.11: Planned Unit Development

When do I need a building permit?

Any structure 200 square feet or greater, or any structure regardless of size that will require plumbing and/or electricity need a permit. Agricultural pole barns require a permit as well as an affidavit affirming the use of the building.

Can I build my own house?

Yes, but you must complete and register an Owner/Builder Certificate. Click HERE for Homeowner’s Disclosure Statement.

Do I need a permit to remodel an existing house?

If the remodeling and/or addition change the structural condition of the home in any manner or includes electrical, plumbing or mechanical changes of any kind, a permit is required.

Does my landscaping have to be complete before my house can be finaled?

No, but it must be completed within 30 days of the final.

May I move my furniture and personal belongings into the house before I receive a Certificate of Occupancy?

No. A house should not be occupied until after the Certificate of Occupancy is issued. 

Do I need a permit for a purchased pre-fab garage/storage building that is delivered to my house and would be utilized for personal use and which contains no electrical or plumbing?

No, but the building must be 10’ off the back and side property lines and cannot exceed 800 sq feet.  There cannot be more than one detached building per developed lot.

How big may I build my detached structure?

A detached structure cannot be more than 800 sq feet

What kind of inspections are required?

You may obtain the inspections required by accessing our "Are You Ready for An Inspection" document.

I am upgrading from a 60-amp service to a 100 or 200 amp service; do I need a permit?

Yes, the electrician doing this changeover should obtain a business license and a permit. Since 60-amp service is no longer accepted, we appreciate your safety-conscience decision to upgrade your power.

Do I need a permit to put up a fence?

No, unless the fence is 8’ or higher.

Do I need a swimming pool permit?

All above ground and in ground pools above 36” must be permitted. A 4 foot high fence or screen enclosure with a self-latching, self-closing lock must surround the pool at the final inspection.

May I move a mobile home on to my Property?

You may move a mobile home into an established Mobile Home Park and/or you may replace a mobile home in the GR1 District under certain conditions. For more details access our "Mobile Homes in the City" document.

I have just moved into a mobile home in a mobile home park, but I don’t have power. When will it be turned on?

Combined Utilities cannot turn your power on until the inspector has released power. To obtain this release a successful inspection must be made of your mobile home. Please see our " Mobile Homes in the City" document to find out more about this inspection.

May I store my car on my property until I can afford license plates and insurance?

Yes, but only if you completely cover the same with a factory-made car cover.

May I place small signs on the road side to advertise my business?

Signs may not be placed in the road right of way. You can access the entire Sign Ordinance in the Zoning Ordinance. Click HERE for Complete signage information.

What type of permanent sign can I install for my business?

The type and size of allowed signs are determined by Article IV of the Zoning Ordinance. Click HERE for Complete signage information.

How do I obtain a sign permit?

You may obtain the sign permit from our website under the Planning & Development Department Or you may call our office at 855-7908 and request that one be faxed to you or mailed to you. Or you may e-mail Tami Hall at thall@cityofeasley.com with your request.

Download Sign Application HERE

I am renting a suite from an already established shopping center; what must I do to obtain my own free-standing sign?

Only one free-standing sign is allowed per developed lot. You should ask the landlord if there is enough available signage to add your sign to the existing free standing sign. Then submit an application. Download Sign Application HERE

I am starting a new business in the City, what do I need to do?

I am relocating my business to another place in the City, what do I need to do?

You must apply for a business license with the Business License Department of City Hall. However, before the license can be issued, you will have to apply and pass a business license inspection. Please see our document "Starting a New Business."

I am clearing enough land to build a small storage shed. Do I have to put up silt fencing?

Yes. Silt fencing is required whenever land is disturbed.

  © 2007 The City of Easley, SC  All rights reserved.

Web Network by Aletheia Web Design

 

Easley City Hall
205 N 1st St Easley, SC, US
Phone: (864) 855-7900 Email Us
Office Hours are 8:30am - 5pm EST Monday - Friday